NORWIND

Operations ·

Design the exception path with the normal workflow

Exceptions often reveal where a business process relies on judgment. A useful internal tool makes those cases visible and gives them a clear route to resolution.

By Norwind

An irregular paper shape cannot fit the standard openings in a sorting cabinet. Similar pieces collect in an overflow tray. Headline: The exception became the workflow. Footer: Norwind, norwind.tech/contact. Conceptual illustration.

Find the cases people handle outside the system

Ask staff which tasks move into chat, email or a personal spreadsheet. Collect representative examples and the reason the standard workflow did not fit. Some may be mistakes that better validation can prevent. Others may be legitimate business cases that the current tool cannot express. Treating both as user error leaves the underlying work unresolved.

Separate a rule from a judgment call

Write down which cases can be handled by an agreed rule and which require a person to decide. Give that person the context needed to act. Avoid forcing an exception into an inaccurate status just so the workflow can continue. A visible waiting state with an owner can be more useful than a record that appears complete but needs hidden follow-up.

Review patterns before adding complexity

Track the kinds of exceptions that recur and ask whether the standard process should change. Keep unusual cases from turning every screen into a collection of rarely used controls. A custom tool can support the business’s actual rules, but those rules still need review. Build enough structure to make judgment traceable without pretending every decision can be automated.

A practical check

  • Collect examples of work handled outside the system.
  • Name the person responsible for judgment calls.
  • Review repeated exceptions before expanding the normal workflow.
← All articles

Tell us what you
are building.

Or what is in the way. We will tell you plainly what it needs, whether that is us or not.

  1. 01A reply from a person
  2. 02A free half-hour call with an engineer
  3. 03A written answer: scope, rough cost, where to start

Replies come from a person, within two working days.