Use a prototype to reduce a specific uncertainty

A prototype earns its place when it helps answer a question before the business commits to a larger build. Its scope should follow that question.

By Norwind

A miniature building facade is revealed as a thin theater backdrop with empty space behind it. Headline: A prototype is not a product team. Footer: Norwind, norwind.tech/contact. Conceptual illustration.

Name the uncertain assumption

The uncertainty may concern how users complete a task, whether required data is available or whether an external system supports a necessary operation. Write down what evidence would change the decision. A prototype built without that boundary can become a small production system by accident, carrying expectations its design cannot support.

Choose the least work that gives useful evidence

A clickable flow may answer a navigation question. A limited technical experiment may answer a connection question. Match the prototype to the uncertainty instead of adding visual polish to every experiment. Use representative situations and explain which parts are simulated. Invite the people whose work or decision is affected to examine the result.

Make an explicit decision afterward

Record what was learned, what remains uncertain and whether to proceed, revise or stop. If the prototype will become production software, review the work needed for permissions, reliability and ongoing operation. Do not assume that a successful experiment has already met those requirements. The prototype’s value is the evidence it creates for the next decision.

A practical check

  • Write the assumption the prototype should examine.
  • Choose a form that can test it with representative evidence.
  • Decide what follows and what production work remains.
← All articles

Tell us what you
are building.

Or what is in the way. We will tell you plainly what it needs, whether that is us or not.

  1. 01A reply from a person
  2. 02A free half-hour call with an engineer
  3. 03A written answer: scope, rough cost, where to start

Replies come from a person, within two working days.